Manufaktur Dirgantara & Pertahanan

XERPIUMAEROSPACE

Solusi ERP Lengkap untuk Industri Dirgantara — Aircraft Type, Part Number, BOM, Work Center, MO, Work Order, ECO, NCR, FAI, Quality Release, Serial Tracking

10Modul
25+Model
AS9102FAI Compliant
AOGPriority Tracking

Ekosistem Manufaktur Dirgantara

XERPIUM AEROSPACE adalah solusi ERP lengkap untuk industri dirgantara & pertahanan — mencakup aircraft type, part number, BOM, work center, manufacturing order, work order sign-off, ECO, NCR, CAPA, FAI AS9102, quality release, serial number traceability, dan supplier management.

AIRCRAFT
Type & Configuration
MRP
MO & Work Order
QUALITY
NCR, CAPA, FAI
📝
ECO
Engineering Change

Data Master Dirgantara

Aircraft Type & Configuration

  • Aircraft Type — Kode unik, manufacturer, kategori (fixed_wing/rotary_wing/uav/glider), MTOW, range, cruise speed, engines, engine type, seats, certification standard
  • Configuration — As-designed, as-built, as-maintained — variant code, description, BOM link per konfigurasi
  • Part Number — Part type (raw/component/assembly/sub-assembly/tooling/consumable), alternates, drawing number/revision, material spec, weight, ITAR/EAR controlled, serial/batch tracking
  • Serial Number — Nomor unik per part, linked ke product, aircraft type, status (available/installed/in_repair/scrapped), flight hours/cycles, overhaul due date
🏢

Work Center & Supplier

  • Work Center — Extended dari mrp.workcenter: center type (assembly/machining/testing/paint/inspection/tooling), certification required, capacity aircraft types, calibration due, environmental controls
  • Tooling — Tool number unik, type (fixture/gauge/special/standard/measuring), calibration interval, last/next calibration, status (available/in_use/calibration/maintenance/retired), owner
  • Supplier — Tier (1/2/3), certifications (AS9100D), quality rating 0-100, on-time delivery rate, approved parts, qualification status, last audit date
📝

ECO — Engineering Change Order

  • ECO — Tipe perubahan: design, process, material, tooling, documentation — link ke BOM, part number, aircraft type
  • Workflow — Draft → Under Review → Approved → Implemented → Closed
  • Approval — Multi-approver: reviewer + approver, timestamp, action (approve/reject)
  • BOM Impact — Change order langsung terhubung ke mrp.bom untuk revision tracking
  • Part Number — Many2many ke part number affected
📦

Material Traceability

  • Material Trace — Batch number, heat treatment number, material certificate, supplier certificate
  • Chemical Composition — Komposisi kimia material, mechanical properties
  • Test Report — Test report reference, date, notes
  • Serial Link — Terhubung langsung ke aerospace.serial.number
  • Audit Trail — Full traceability dari raw material hingga finished part
📷
Screenshot: Master Data Dirgantara
Aircraft Type, Part Number, Work Center, Tooling, Supplier, ECO, Material Trace

Manufacturing Order & Work Order

⚙ Manufacturing Order

  • MO Extension — Extended dari mrp.production: aircraft type, serial number, configuration, customer, priority (AOG/Critical/High/Normal/Low)
  • Quality Release — Flag quality_release_required, link ke aerospace.quality.release
  • Sign-off — sign_off_required, sign_off_by (res.users), sign_off_date, actual_completion_date
  • Sequence — Auto-numbering per company, mail thread tracking
  • BOM Integration — MO dibuat dari BOM per aircraft type & configuration

✍ Work Order

  • Work Order Extension — Extended dari mrp.workorder: operator_id (hr.employee), sign-off required, sign-off by, sign-off date
  • Tool Tracking — Many2many ke aerospace.tool: assignment tool per work order
  • Special Instructions — Field khusus instruksi pengerjaan
  • Digital Sign-off — action_sign_off(): set operator, timestamp, selesai
  • Operator Assignment — Operator dari hr.employee dengan kualifikasi sesuai

🔧 Sample Work Centers

  • Assembly Line 1 — Perakitan utama dengan kapasitas per aircraft type
  • Machining 1 — Pemesinan presisi, certification required
  • Testing Station 1 — Uji fungsional & performance
  • Paint Shop 1 — Pengecatan & coating spesifikasi aerospace
  • Quality Inspection 1 — Inspeksi kualitas dengan calibration due tracking
  • Tooling 1 — Pusat perkakas & fixture

📈 Dynamic Stages

  • Serial Number Stages — Draft → Available → Installed → In Repair → On Hold
  • ECO Stages — Draft → Under Review → Approved → Implemented → Closed
  • Quality Release — Draft → Pending → Released → On Hold
  • Configurable — Dynamic stage framework per model
📷
Screenshot: Manufacturing Orders
MO with Aircraft Type, Work Order Sign-off, Tool Tracking, Quality Release

Quality — NCR, CAPA, FAI, Inspection

Sistem kualitas lengkap untuk aerospace: Non-Conformance Report, Corrective/Preventive Action, First Article Inspection AS9102, Inspection Plans, Quality Release.

⚠ NCR — Non-Conformance Report

  • NCR — Non-conformance number auto, severity level, root cause, disposition
  • Linked MO — manufacturing_order_id langsung ke mrp.order
  • Part Number — Affected part, serial number, quantity
  • Disposition — Use-as-is, rework, repair, scrap, return-to-supplier
  • Root Cause — Cause analysis, containment action, corrective action

📝 CAPA — Corrective & Preventive Action

  • Corrective Action — Action plan, assigned to, due date, status tracking
  • Effectiveness — Verification of effectiveness, closed-loop
  • Preventive Action — Prevent recurrence, monitoring plan
  • Linked NCR — CAPA berasal dari temuan NCR

🔬 FAI — First Article Inspection

  • AS9102 Compliant — Full, partial, delta FAI sesuai AS9102
  • Linked MO — manufacturing_order_id untuk first article
  • Inspection Lines — Nominal, min, max, actual — auto pass/fail
  • Part Number — Part, serial number, drawing revision
  • Results — Pass/fail per karakteristik, overall result

📄 Inspection Plan & Quality Release

  • Inspection Plan — Incoming, in-process, final inspection per part number
  • Plan Lines — Inspection points, method, specification, frequency
  • Quality Release — Certificate of conformance: draft/pending/released/on_hold
  • Released By — Authorized signatory, timestamp, linked MO
📷
Screenshot: Quality Control
NCR Form, CAPA Workflow, FAI AS9102, Inspection Plan, Quality Release Certificate

Akuntansi Manufaktur Dirgantara

Jurnal manufaktur otomatis dari material consumption hingga finished goods — integrasi mrp_account & COA aerospace.

Jurnal Manufacturing

StepJurnal
Component ConsumptionDR WIP / CR Raw Material Inventory
Direct LaborDR WIP / CR Wages Payable
OverheadDR WIP / CR Overhead Applied
Finished GoodsDR Finished Goods / CR WIP
COGSDR COGS / CR Finished Goods

COA Aerospace

  • COA Khusus — Chart of accounts untuk manufaktur dirgantara Indonesia
  • Akun Biaya — Bahan baku, tenaga kerja langsung, overhead pabrik, WIP
  • Pendapatan — Penjualan produk aerospace, jasa MRO, engineering
  • Balance Sheet — Aset lancar (persediaan, WIP), aset tetap (mesin, alat ukur)
  • P&L — Revenue, COGS, beban engineering, quality, sertifikasi

Dashboard & KPI

KPI real-time untuk operasional dirgantara — open MO, produksi status, quality metrics, fleet utilization.

Open MO
Manufacturing Orders
NCR
Open Non-Conformances
Fleet
Aircraft Utilization

KPI Dashboard

  • Total MO — Manufacturing orders by state
  • Efficiency — qty_produced sum, target 100%
  • Downtime — Work center downtime trend
  • Open NCR — Non-conformance belum closed
  • FAI Status — First article inspection pass/fail rate

Integrasi Cross-Module

  • Accounting — WIP & COGS journal otomatis, COA khusus aerospace
  • Inventory — Serial number tracking, lot/expiry, traceability
  • Purchase — Supplier management, approved parts, quality rating
  • HR — Operator assignment, sign-off by employee, certification tracking
  • AI Assistant — Cari part number, cek status MO, generate report

Mengapa XERPIUM AEROSPACE?

AspekSistem Manual / LegacyXERPIUM AEROSPACE
Aircraft DataExcel, drawing terpisah✓ Type, config, part number, serial terintegrasi
BOM & MOManual, rentan error✓ Per aircraft type & config, auto BOM resolve
Work OrderKertas, tanda tangan manual✓ Digital sign-off, tool tracking, operator
QualityNCR kertas, susah trace✓ NCR, CAPA, FAI AS9102, inspection plan
ECOEmail, spreadsheet✓ Multi-approver, BOM link, revision tracking
ToolingBuku inventaris✓ Calibration scheduling, status tracking
SupplierFile vendor terpisah✓ Tier, certification, quality rating, approved parts
Serial TraceManual, susah audit✓ Full life cycle, flight hours, airframe tracking
AkuntansiPembukuan manual✓ WIP auto, COA aerospace, B/S & P&L
Try nowKontak